HEAVY CIVIL
Industrial Demolition
Demolition of structures, tanks, piping, foundations, and full process units, including work inside operating facilities.
Live Plants
demolition inside operating facilities
Full Units
down to structures, tanks, and piping
Salvage
and scrap recovery included
0.0
TRIR and DART rate
Demolition That Respects the Plant Around It
Industrial demolition rarely happens on an empty site. Neighboring units keep running, and new construction is waiting on the space. Spector Services performs demolition inside operating facilities, from piping and tanks to structures, foundations, and full process units.
Salvage and scrap recovery are part of the job, and abatement is handled through qualified subcontractors. Because Spector also self-performs civil, piping, and structural construction, the same contractor can take an area from demolition through new work.
What We Demolish
Spector crews handle the full range of industrial demolition.
- Structures and buildings
- Tanks
- Piping removal
- Foundations and concrete
- Full process units
- Salvage and scrap recovery

Capabilities at a Glance
Delivery
Prime contractor or subcontractor, depending on how the project is structured.
Scope
Structures, tanks, piping, foundations, and full process units.
Operating Facilities
Demolition performed inside active plants, around ongoing operations.
Salvage and Scrap
Salvage and scrap recovery handled as part of the job.
Abatement
Handled through qualified subcontractors as part of the demolition plan.
Follow-On Work
Civil, piping, and structural construction from the same contractor.
How We Deliver Demolition
STEP 1
Review the Scope
We review drawings, isolation requirements, and site rules before pricing, so questions get answered at bid time instead of in the field.
STEP 2
Plan the Sequence
Demolition sequence, access, and salvage handling are planned around the facility’s operations.
STEP 3
Coordinate Abatement
Where hazardous materials are present, abatement is handled through qualified subcontractors as part of the plan.
STEP 4
Demolish and Remove
Structures, equipment, piping, and foundations are taken down and removed in the planned sequence.
STEP 5
Recover and Turn Over
Salvage and scrap are recovered, debris is cleared, and the area is ready for what comes next.
Safety You Can Verify
Demolition inside operating plants leaves no room for shortcuts. Here is the record Spector Services brings to it.
0.0 TRIR and DART
No recordable injuries and no days-away, restricted, or transferred cases.
A Grades
Rated A on both ISNetworld and Veriforce.
Dedicated Safety Personnel
Safety staff dedicated to Spector’s field operations.
Site-Ready Crews
Field crews carry TWIC cards and Safety Essentials/Basic Plus training.
What to Send for a Demolition Bid
A complete package gets you a faster, tighter number. Send what you have, and we will ask for anything else we need.
- Demolition scope, drawings, or equipment list
- Hazardous materials survey
- Isolation and energy control requirements
- Salvage and scrap expectations
- Site rules, access, and working hours
- Schedule and outage windows
FAQ
Demolition Questions
Quick answers for plant owners and general contractors planning demolition. Have a question that isn’t covered here? Talk to us directly.
Yes. Spector performs demolition inside active plants, with the sequence planned around ongoing operations.
Yes. Salvage and scrap recovery are handled as part of the demolition scope.
Abatement is handled through qualified subcontractors and coordinated as part of our demolition plan.
Yes. Spector self-performs civil, piping, and structural construction, so the same contractor can take an area from demolition through new work.
We are based on the Texas Gulf Coast, where most of our work is, and we take on projects nationwide.
Related Services
Planning Demolition?
Send the scope, hazardous materials survey, site rules, and schedule. We will review the package and follow up with questions or a bid.