HEAVY CIVIL

Industrial Demolition

Demolition of structures, tanks, piping, foundations, and full process units, including work inside operating facilities.

Live Plants

demolition inside operating facilities

Full Units

down to structures, tanks, and piping

Salvage

and scrap recovery included

0.0

TRIR and DART rate

Demolition That Respects the Plant Around It

Industrial demolition rarely happens on an empty site. Neighboring units keep running, and new construction is waiting on the space. Spector Services performs demolition inside operating facilities, from piping and tanks to structures, foundations, and full process units.

Salvage and scrap recovery are part of the job, and abatement is handled through qualified subcontractors. Because Spector also self-performs civil, piping, and structural construction, the same contractor can take an area from demolition through new work.

What We Demolish

Spector crews handle the full range of industrial demolition.

  • Structures and buildings
  • Tanks
  • Piping removal
  • Foundations and concrete
  • Full process units
  • Salvage and scrap recovery
Construction equipment working on a dirt road near a waterway with a large ship in the background.

Capabilities at a Glance

Delivery

Prime contractor or subcontractor, depending on how the project is structured.

Scope

Structures, tanks, piping, foundations, and full process units.

Operating Facilities

Demolition performed inside active plants, around ongoing operations.

Salvage and Scrap

Salvage and scrap recovery handled as part of the job.

Abatement

Handled through qualified subcontractors as part of the demolition plan.

Follow-On Work

Civil, piping, and structural construction from the same contractor.

How We Deliver Demolition

STEP 1

Review the Scope

We review drawings, isolation requirements, and site rules before pricing, so questions get answered at bid time instead of in the field.

STEP 2

Plan the Sequence

Demolition sequence, access, and salvage handling are planned around the facility’s operations.

STEP 3

Coordinate Abatement

Where hazardous materials are present, abatement is handled through qualified subcontractors as part of the plan.

STEP 4

Demolish and Remove

Structures, equipment, piping, and foundations are taken down and removed in the planned sequence.

STEP 5

Recover and Turn Over

Salvage and scrap are recovered, debris is cleared, and the area is ready for what comes next.

Safety You Can Verify

Demolition inside operating plants leaves no room for shortcuts. Here is the record Spector Services brings to it.

0.0 TRIR and DART

No recordable injuries and no days-away, restricted, or transferred cases.

A Grades

Rated A on both ISNetworld and Veriforce.

Dedicated Safety Personnel

Safety staff dedicated to Spector’s field operations.

Site-Ready Crews

Field crews carry TWIC cards and Safety Essentials/Basic Plus training.

What to Send for a Demolition Bid

A complete package gets you a faster, tighter number. Send what you have, and we will ask for anything else we need.

  • Demolition scope, drawings, or equipment list
  • Hazardous materials survey
  • Isolation and energy control requirements
  • Salvage and scrap expectations
  • Site rules, access, and working hours
  • Schedule and outage windows

FAQ

Demolition Questions

Quick answers for plant owners and general contractors planning demolition. Have a question that isn’t covered here? Talk to us directly.

Yes. Spector performs demolition inside active plants, with the sequence planned around ongoing operations.

Planning Demolition?

Send the scope, hazardous materials survey, site rules, and schedule. We will review the package and follow up with questions or a bid.