PIPING & MECHANICAL
Industrial Mechanical Construction
Equipment setting for pumps, compressors, exchangers, vessels, and skids, plus the piping and bolted joints that tie them in.
Set & Tied In
equipment plus connecting piping
All Equipment
pumps, compressors, exchangers, vessels, skids
Turnarounds
and outage work
0.0
TRIR and DART rate
Equipment Set, Piped, and Ready for Turnover
Setting equipment is only part of the job. It still has to be piped, bolted, and documented before it can run. Spector Services sets pumps, compressors, exchangers, vessels, and skids, then installs the piping and makes up the bolted joints that tie them in.
Alignment, grouting, and hot taps are handled through qualified subcontractors and coordinated inside our scope, and cranes are rented to match each lift. We work new installations and turnaround and outage scopes, as prime contractor or subcontractor.
What We Set
Spector crews handle equipment setting and the work that ties it in.
- Pumps
- Compressors
- Heat exchangers
- Vessels
- Skids
- Connecting piping and bolted joints
- Coordination of alignment, grouting, and hot taps

Capabilities at a Glance
Equipment
Pumps, compressors, exchangers, vessels, and skids.
Piping
Connecting piping in every material and size, welded to qualified procedures.
Bolting
Joint assembly following ASME PCC-1, with flange tagging and torque reports.
Specialty Work
Alignment, grouting, and hot taps through qualified subcontractors.
Lifting
Rental cranes sized to each project’s lifts.
Delivery
Prime contractor or subcontractor, on new installations, turnarounds, and outages.
How We Deliver Mechanical Work
STEP 1
Review the Package
We review equipment data sheets, foundation drawings, and piping isometrics before pricing, so questions get answered at bid time instead of in the field.
STEP 2
Plan Lifts and Sequence
Lifts, crane rentals, and installation sequence are planned around the site and schedule.
STEP 3
Set the Equipment
Equipment is set on its foundations, with alignment and grouting coordinated through qualified subcontractors.
STEP 4
Pipe and Bolt Up
Connecting piping is installed and welded, and bolted joints are made up following ASME PCC-1.
STEP 5
Test and Turn Over
Systems are tested, and weld maps, torque reports, and flange maps go to you with the equipment.
Safety You Can Verify
Equipment setting puts crews under heavy lifts and next to operating systems. Here is the record Spector Services brings to it.
0.0 TRIR and DART
No recordable injuries and no days-away, restricted, or transferred cases.
A Grades
Rated A on both ISNetworld and Veriforce.
Dedicated Safety Personnel
Safety staff dedicated to Spector’s field operations.
Site-Ready Crews
Field crews carry TWIC cards and Safety Essentials/Basic Plus training.
What to Send for a Mechanical Bid
A complete package gets you a faster, tighter number. Send what you have, and we will ask for anything else we need.
- Equipment list and data sheets
- Foundation and anchor bolt drawings
- Piping isometrics and tie-in points
- Lift weights and crane access
- Alignment and grouting requirements
- Turnaround or outage windows and schedule
FAQ
Mechanical Construction Questions
Quick answers for owners and general contractors planning equipment installations. Have a question that isn’t covered here? Talk to us directly.
Pumps, compressors, heat exchangers, vessels, and skids.
Yes. We install and weld the connecting piping and make up the bolted joints, so the equipment is tied in by one contractor.
Alignment and grouting are performed by qualified subcontractors, coordinated as part of our scope.
We rent cranes sized to each project’s lifts and plan the sequence around your site and schedule.
Yes. We work inside planned turnaround and outage windows as well as on new installations.
Related Services
Planning an Equipment Installation?
Send the equipment list, data sheets, piping drawings, and schedule. We will review the package and follow up with questions or a bid.