PIPING & MECHANICAL

Process Piping & Field Installation

Field installation of process piping in every material and size, built to ASME B31.3, tested, and documented for turnover.

B31.3

process piping code

All Sizes

in every pipe material

Turnarounds

and outage work

0.0

TRIR and DART rate

Installed to Code, Documented for Turnover

Process piping work comes down to tie-ins, schedule windows, and documentation. Spector Services installs process piping in every material and size, with welding procedures qualified to ASME B31.3 and anything else your specification calls for.

AWS Certified Welding Inspectors on staff inspect the work in the field, and hydrotesting is performed in-house or through qualified subcontractors. Every system turns over with weld maps, material test reports, hydrotest packages, flange maps, and heat maps. We handle new construction, tie-ins, and turnaround and outage scopes, and our facility piping clients include Energy Transfer.

What We Install

Spector crews handle the full process piping scope in the field.

  • New process piping installation
  • Tie-ins to existing systems
  • Turnaround and outage piping
  • Field welding to qualified procedures
  • Flange bolt-up following ASME PCC-1
  • Hydrotesting
  • Turnover documentation
Excavated trench with new piping and valves beside a pipe rack and storage tanks

Capabilities at a Glance

Materials and Sizes

Every pipe material and every size.

Code

ASME B31.3, plus any other code your specification requires.

Welding Procedures

Qualified to the code and specification your project requires.

Inspection

AWS Certified Welding Inspectors on staff, with NDE in all methods through qualified subcontractors.

Testing

Hydrotesting performed in-house or through qualified subcontractors.

Turnover

Weld maps, material test reports, hydrotest packages, flange maps, and heat maps.

How We Deliver Process Piping

STEP 1

Review the Package

We review isometrics, line lists, and piping specifications before pricing, so questions get answered at bid time instead of in the field.

STEP 2

Plan Tie-Ins and Windows

Tie-ins, shutdown windows, and material are planned with your team before mobilization.

STEP 3

Fabricate and Install

Spools are fabricated in the shop or field as the project requires, then installed and welded to qualified procedures.

STEP 4

Inspect and Test

Our CWIs inspect the welds, qualified subcontractors perform NDE, and systems are hydrotested in-house or through qualified partners.

STEP 5

Document and Turn Over

Weld maps, material test reports, hydrotest packages, flange maps, and heat maps go to you with the system.

Safety You Can Verify

Process piping work often happens inside operating units, around live systems and hot work. Here is the record Spector Services brings to it.

0.0 TRIR and DART

No recordable injuries and no days-away, restricted, or transferred cases.

A Grades

Rated A on both ISNetworld and Veriforce.

Dedicated Safety Personnel

Safety staff dedicated to Spector’s field operations.

Site-Ready Crews

Field crews carry TWIC cards and Safety Essentials/Basic Plus training.

What to Send for a Process Piping Bid

A complete package gets you a faster, tighter number. Send what you have, and we will ask for anything else we need.

  • Isometrics and P&IDs
  • Line list and piping specifications
  • Bill of materials or material take-off
  • Welding, NDE, and testing requirements
  • Tie-in list and shutdown windows
  • Turnover documentation requirements
  • Site access, working hours, and schedule

FAQ

Process Piping Questions

Quick answers for owners and general contractors planning process piping work. Have a question that isn’t covered here? Talk to us directly.

All of them. Spector installs process piping in every material and every size.

Planning Process Piping Work?

Send isometrics, specifications, tie-in lists, and schedule. We will review the package and follow up with questions or a bid.

Scroll to Top