STRUCTURAL

Structural Steel Fabrication & Installation

Fabrication and erection of pipe racks, platforms, equipment supports, buildings, and miscellaneous steel, welded to AWS D1.1.

AWS D1.1

structural welding code

Self-Performed

fabrication and erection

AWS CWIs

Certified Welding Inspectors on staff

0.0

TRIR and DART rate

Fabrication Planned Around Erection

Steel that fits in the shop but fights the field costs schedule. Spector Services fabricates and erects structural steel as one scope, so fabrication is planned around how the steel will go up.

We fabricate from approved shop drawings in the shop or field, depending on the job. Welding follows AWS D1.1 with AWS Certified Welding Inspectors on staff, erection is self-performed with cranes rented to match each lift, and coatings and fireproofing can be added to the same scope. Our steel work includes two steel spillboxes built for the Sabine-Neches Navigation District.

What We Build

Spector fabricates and erects structural steel for industrial facilities.

  • Pipe racks
  • Platforms, stairs, and handrail
  • Equipment supports
  • Industrial buildings
  • Miscellaneous metals
  • Steel spillboxes
  • Field erection
Steel spillbox frames and large-diameter pipe set in an excavation, with excavators nearby

Capabilities at a Glance

Scope

Pipe racks, platforms, stairs and handrail, equipment supports, buildings, and miscellaneous metals.

Welding

AWS D1.1 structural welding.

Inspection

AWS Certified Welding Inspectors on staff.

Erection

Self-performed, with rental cranes sized to each lift.

Shop and Field

Fabrication in the shop or field, depending on the job.

Protection

Coatings and fireproofing, inspected by AMPP-certified coating inspectors.

How We Deliver Structural Steel

STEP 1

Review the Drawings

We review design drawings, shop drawings, and specifications before pricing, so questions get answered at bid time instead of in the field.

STEP 2

Plan Fabrication and Erection

Fabrication sequence, shop and field split, and crane lifts are planned together.

STEP 3

Fabricate and Weld

Steel is fabricated and welded to AWS D1.1, and our CWIs inspect the welds.

STEP 4

Coat and Protect

Surface preparation, coatings, and fireproofing are applied as your specification requires.

STEP 5

Erect and Turn Over

Our crews erect the steel with rental cranes sized to each lift and turn it over ready for the next trade.

Safety You Can Verify

Steel erection puts crews at height and under suspended loads. Here is the record Spector Services brings to it.

0.0 TRIR and DART

No recordable injuries and no days-away, restricted, or transferred cases.

A Grades

Rated A on both ISNetworld and Veriforce.

Dedicated Safety Personnel

Safety staff dedicated to Spector’s field operations.

Site-Ready Crews

Field crews carry TWIC cards and Safety Essentials/Basic Plus training.

Structural Steel Experience

Navigation District Spillbox Construction

Two steel spillboxes built for the Sabine-Neches Navigation District.

What to Send for a Structural Steel Bid

A complete package gets you a faster, tighter number. Send what you have, and we will ask for anything else we need.

  • Design drawings and approved shop drawings
  • Specifications and connection details
  • Estimated tonnage or material list
  • Coating and fireproofing requirements
  • Erection sequence, site access, and crane locations
  • Schedule and delivery dates

FAQ

Structural Steel Questions

Quick answers for owners and general contractors planning structural steel work. Have a question that isn’t covered here? Talk to us directly.

Pipe racks, platforms, stairs and handrail, equipment supports, buildings, and miscellaneous metals.

Planning Structural Steel Work?

Send drawings, specifications, coating requirements, and schedule. We will review the package and follow up with questions or a bid.

Scroll to Top